Site & civil
Confirm floor capacity, slab tolerances, column grid, sprinkler clearances, egress, seismic requirements and building-envelope interfaces.
EvidenceApproved drawings, survey and site readiness recordA storage project crosses structural design, operations, EHS, facilities, maintenance, WMS/WCS interfaces and suppliers. Our working principle is simple: important assumptions, ownership boundaries and acceptance evidence should be visible early enough for the right people to challenge them before steel and controls decisions harden.
Planning references in the brand seed—such as a 1997 generated-range year, approximately 250+ people, 21 countries or 900+ SKUs—are retained only as internal orientation. They are not published here as independently verified corporate claims.

Titles vary by project, but every load rating, aisle width, fire clearance, control state and test result needs an owner. The matrix should identify who provides input, who approves, who performs work and who receives the evidence.
Confirm floor capacity, slab tolerances, column grid, sprinkler clearances, egress, seismic requirements and building-envelope interfaces.
EvidenceApproved drawings, survey and site readiness recordDefine bay geometry, load notices, selectivity, guarding, maintenance access, automation envelope and documented limitations.
EvidenceSubmittal, load calculation summary and equipment test recordMap WMS, WCS, PLC, shuttle or crane handshakes across normal, blocked-lane and recovery states.
EvidenceState diagram, I/O list and cause-and-effect reviewApprove traffic procedures, exclusion zones, manual modes, training boundaries and restart authorization after an exception.
EvidenceOperating procedure, training and SAT observationFactory and site acceptance are not interchangeable. FAT can verify defined equipment and controls behavior before shipment, while SAT proves installation, interfaces and operating sequences in the real warehouse. The test basis should state preconditions, loads, roles, observations and how failed steps are closed.
Where a storage aisle enters a live fulfillment operation, commissioning also needs a traffic plan, fallback positions and authority to stop. A phased release can protect continuity, but only if operators know which locations and modes are available during each window.
Freeze load units, access rules, interface responsibilities and acceptance criteria before fabrication or configuration decisions become expensive.
Exercise agreed sequences, alarms and recovery cases within the available factory boundary; record exclusions for site verification.
Verify geometry, anchors, upright plumb, beam locks, devices, labels and guarded areas before energized operational testing.
Observe representative loads and replenishment, close exceptions, deliver documentation and confirm who authorizes ongoing operation.
Application, integration and documentation support is defined by project scope. Equipment models, local regulations, service agreements, geography and site access determine the actual response path; they should not be replaced by a generic global coverage claim.
Coordinate site dimensions, utilities, interfaces, fire access, delivery sequence and responsibilities.
Use approved test steps, representative pallet or tote conditions, issue tracking and signed handover evidence.
Connect inspection, maintenance, spares, diagnostics and escalation to the operating profile.